Gypsum board ceiling installation method statement.
To ensure that the gypsum board suspended ceiling and related activities are executed safely and in accordance with the contract requirements and that all quality assurance control activities are conducted in a systematic manner to ensure that works are inspected conformance is verified and documented.
O submitted technical submittal for acoustic treatment.
Civil method statements tags.
Beam grid ceiling tiles baffles gypsum board method statement for false ceiling works post navigation method statement for erection and dismantling of slab formwork method statement for grp lining and ladder installation in water tanks.
Obtain necessary clearances and approvals from engineers including mep clearance.
Proper scaffolding should be provided for installation work.
This also outlines the health and safety hazards involved and include the guide on how to do the process safely.
Perimeter angle of 25mm x 25mm is set on all sides of the ceiling giving a base for gypsum board ceiling or as manufacturer instruction.
Installation of gypsum board construction methodology gypsum board method statement for installation of mf false ceiling works gypsum board.
The main runner or the c channel is spaced at 1200mm on center holding the framed furring channel to which the gypsum ceiling board is fixed at right angle or as manufacturer instruction.
Submission documents 2 1 technical data.
Below is given safe work method of statement for the installation of gypsum board ceiling work in simple steps which can be followed for easy understanding and sequencing the works.
Method statement for drywall work 1 general requirements 1 1 the installer shall supply and install the gypsum calcium silicate board in accordance with specification as shown on the drawings.
The long sides of the panels.
Gypsum board ceiling installation method statement.
Site construction methodology gypsum board installation to ceiling steel framing installation actual site photos installation fixing and suspension component gypsum board installed to furring.
Standard panels come in 4 foot widths and 8 10 and 12 foot lengths.
This procedure is applicable to the following works associated with.
The general rule for hanging ceiling drywall is to install the largest panels you can handle.